Wednesday, December 30, 2009

30 December, 2009

Sanded final coat of joint compound in 3rd floor kitchen and bathroom. Swept and vacuumed. Painted walls, ceiling and trim of both rooms with primer/stainblocker. Shopping trip and dropped Chrysler off for timing belt and water pump.