Saturday, January 09, 2010

9 January 2010

Finished laminate floor, installed cabinets in third floor kitchen. Another 1/4 of stairway baseboards and railing painted.

8 January 2010

WTS application in the morning. Painted another 1/4 of stair railing. Fabricated and installed third floor shower rod. Trimmed door and re-installed hardware. Finished transition to laminate at top of stairs.

Friday, January 08, 2010

7 January 2010

Set shower base into mortar and left to cure. Installed third floor bathroom medicine cabinet/vanity mirror and kitchen wall cabinets. Painted fire escape ladder cover.

Thursday, January 07, 2010

6 January 2010

Installed sink and vanity base in third floor bathroom. Prepared subfloor and plumbing for shower base. Painted 1/2 of the stair railing.

Tuesday, January 05, 2010

5 January 2010

Installed another 1/3 of kitchen floor. Built 9 cabinets. Got Chrysler back from mechanic and shopping trip.

4 January 2010

Installed vinyl plank flooring in third floor bathroom. Finished leveling kitchen subfloor and installed 1/3 of the laminate flooring in the kitchen. Involved removing and re-installing two radiators. Painted odds and ends.

Saturday, January 02, 2010

2 January 2010

Troweled mortar into low spots in third floor bathroom. Vacuumed and leveled kitchen (sub)floor. Put snow tires on truck and took a trip to the mechanic about the Chrysler.

Friday, January 01, 2010

1 January 2010

Painted two coats on third floor kitchen and bathroom walls. Installed ceiling vent in bathroom. Prepped and painted fire escape cover. Cut out and caulked access panel to bathroom plumbing. Mounted two fire alarms and sanded corners of second floor countertop.

31 December 2009

Caulked third floor kitchen and bath, second coat of primer where needed, painted ceilings, doors and trim. Glued two end pieces to second floor countertop.